Before You Order Hardware

List three numbers from your lease and facilities contact: permitted equipment noise at the suite door, breaker size on your chosen circuit, and whether 24/7 operation is allowed. Compact ASIC units from 0.05 TH/s upward are physically small but electrically continuous.

Staging Checklist

Power

  • Photograph breaker label and any sub-panel stickers.
  • Confirm whether your circuit is shared with kitchen, printer, or lighting loads.
  • Budget 20% headroom below breaker rating for inrush when fans spin up.

Air Path

  • Mark intake and exhaust paths with at least 60 cm clearance.
  • Note if suite air is recirculated only—common in older Gangnam retrofits.
  • Plan filter access; office dust clogs compact miners faster than datacenter floors.

Acoustics

  • Measure ambient dB at desk and corridor with a phone meter app for baseline.
  • Identify hours when neighbours are present; night runs may still violate lease clauses.

Physical

  • Floor load is rarely an issue for desk units; wall vibration can transfer through partition studs.
  • Keep spill containment if your suite has strict cleanliness clauses.
  1. Thermal Load Survey if HVAC is marginal or room is enclosed.
  2. Office ASIC Fit Review with your shortlisted models.
  3. Hash Rate Verification after install if you bought used or grey-market stock.

Seasonal Note for Seoul

July and August afternoon ambient routinely pushes office suites above 28 °C. Units rated at 0.1 TH/s may throttle earlier than spring benchmarks. Schedule critical measurements before mid-June or after September if possible.

Get a Written Fit Report

Office ASIC Fit Review Ask a Question