Thermal Load Survey
Maps heat output and HVAC response for compact ASIC placement in air-conditioned offices.
Overview
Before you bolt a miner under a desk, know whether your afternoon HVAC cycle can absorb the watts. This survey uses infrared spot readings and logging thermometers to chart how a compact unit shifts room equilibrium over a two-hour run.
Included
- Pre-run and post-run temperature grid (nine points)
- Supply and return air delta at your cassette or duct outlet
- Recommendation for baffle placement or auxiliary fan if needed
- Seasonal note for July–August peak load in Seoul
Not Included
Structural modifications, refrigerant service, or landlord negotiations.
Typical Timeline
Book within one week; report within three business days after visit.